Next we welded in the cowl piece cut from the CJ tub into the YJ tub.
For ease of removal of the old tub, we started to cut up the old tub for ease of hauling and less weight.
With only the floor left, I will next cut the floor in half right at the step for the back seat.  Watch for emergency brake cables and fuel lines before cutting!
Keep a large bin handy to put all your parts, nuts, bolts and screws.  This should be the last piece to remove and the body is off.
 
After removing the body, we removed all old exaust mounts and cut away any rusted frame.  The only rust we had on this frame was on the old body mount holes in the most rear frame crossover.

For questions or comments please feel free to e-mail me at bruce2@wwolf.net
[ 3 ]
Home | Helpful Links | Restoration | Teardown